Where the colossus meets the Fortune Global Master Piece
Consistent demonstration of expertise and capacity to deliver from one high demanding turnkey project to another is among the many ways to describe the Fortune Global journey of excellence.
The most recent stroke of genius was the masterly handling of the inward clearance and logistics of the EGINA FPSO (Floating, Production, Storage and Offloading) which sailed from Geoje, South Korea and arrived for final integration/fabrication work at SHI-MCI QUAY, LADOL Free Zone, on January 24, 2018. With a storage capacity of 2million barrels, the 219,830 ton and 316.84 meters long EGINA FGSO, is set to increase Nigeria’s oil production capacity by 208,000 barrels per day.
It is worthy to recall that Fortune Global also demonstrated best-in-class proficiency in handling an important aspect of the project in June 2017, for the design, planning and execution of the transportation of Steel Structures (Riser Porches) from Nigerdock Free Zone to SHI-MCI/Ladol Free Zone, (which was part of the logistics support for OML 130 Total Egina FPSO Project), in collaboration with SAL Heavy Lift GMBH.
For this current project, Fortune Global remains committed to delivering excellently and ensuring that the logistics management of EGINA (the largest FPSO in Africa) records a remarkable success till she is delivered to Egina Offshore field – OML 130 sometime this year.